Arriving Earlier to Budapest Airport Is Now Crucial

Hungary Today 2025.02.20.

On February 20, work will begin on the bridge leading to the airport. Traffic restrictions and tighter parking conditions in the area are to be expected. According to Budapest Airport, you should arrive at the terminal earlier than planned, reported Index.

The renovation of the bridge leading to Terminal 2 of Liszt Ferenc International Airport will begin on Thursday and is expected to be completed in June 2025. The works will lead to traffic restrictions on the arrivals level: passengers will not be able to drive up to the departure (upper) level of the airport, while the area used for boarding and alighting will be reduced on the arrivals (lower) level.

Budapest Airport has also warned that parking regulations will be tightened in its operating area. “Budapest Airport has been preparing for the renovation works for months in order to ensure that traffic flows smoothly during this period, and the temporary traffic regime has been designed to ensure the area’s permeability as much as possible. As with curbside,

passengers will be able to use the Terminal Car Park, marked with green signs, and the City Break Car Park, marked with purple signs, free of charge for 5 minutes, twice a day,”

a representative from the airport told 24.hu.

In their response, they said that they had already started to provide extensive information about the closure in early February through several channels, including the media, their own social media platforms and the bud.hu website, so that people could be informed of the changes in good time.

The airport also stated that

Budapest Airport recommends that passengers arrive at the airport 2.5 hours before the departure of their flight.”

Although it is important to remember that before the restrictions, they suggested that passengers arrive two hours before the departure of their flight.

Earlier, it was announced that the terminal of the 100E bus will be moved to a new location on the outer curve of the arrivals level by June 2025. During the renovation, the 200E bus will stop at the usual bus stop, and buses not operated by BKK will use the Bus Terminal instead of the departure level. Due to the change in traffic regulations, motorists are requested to approach the airport with greater caution and in accordance with the changed road signs.

Airport to Open for Sport Aircraft and Business Travelers in Miskolc
Airport to Open for Sport Aircraft and Business Travelers in Miskolc

The facility will be primarily a sports airport, which will also welcome business jets, investors, and official visitors.Continue reading

Via Index, 24.hu; Featured picture: MTI/Koszticsák Szilárd


Array
(
    [1536x1536] => Array
        (
            [width] => 1536
            [height] => 1536
            [crop] => 
        )

    [2048x2048] => Array
        (
            [width] => 2048
            [height] => 2048
            [crop] => 
        )

)